ghorn
Outfitting in Hamburg
Posts: 993
|
Post by ghorn on Dec 21, 2016 14:08:52 GMT 1
Do we now know how many A350s will be delivered in 2016.
With 40 delivered and another 9 ready or almost ready to go.
What are the risks that any of these 9 will not be delivered.
We understand that AerCap has agreed to take 52 and 55. So they should recorded as delivered.
66, 67, 73, 75, 77, 79 and 81 all look to be on schedule. Any risks ?
Geoff
|
|
XWB
in service - 11 years
Posts: 16,115
|
Post by XWB on Dec 21, 2016 14:20:11 GMT 1
MSN 66, 77 and 79 are to be delivered this week, with MSN 67, 73, 75 and 81 to follow next week.
|
|
mfranjic
Final Assembly Line stage 1
Posts: 222
|
Post by mfranjic on Dec 22, 2016 16:07:10 GMT 1
Updated delivery list [ Reply # 20 / Page 2 or click ] of the A350 with the: · Airbus A350-941 - MSN 074, LH # 1, reg. D-AIXA, delivered on 21. Dec 2016 · Airbus A350-941 - MSN 077, SQ # 9, reg. 9V-SMI, delivered on 21. Dec 2016 On the (click on the image below)
1) Lufthansa´s 1st Airbus A350-941 - MSN 074, reg. D-AIXA (test reg. F-WZNC), with the cabin configuration C48 W21 Y224, powered by two Trent XWB-84, three-shaft turbofans (fan diameter: 118,0 in / 2.997,2 mm; engine architecture: 1F+8IPC-6HPC ^ 1HPT-2IPT-6LPT), each 374,54 kN / 38.192 kgf / 84.200 lbf, flying on the route TLS-MUC (FLT LH9921), was delivered to the customer on 21. Dec 2016. The aircraft first flew on 29. Nov 2016.
Lufthansa´s 1st Airbus A350-941 - MSN 074, reg. D-AIXA - delivery FLT LH9921 (TLS-MUC) (click on the image) .2) Singapore Airlines´ 9th Airbus A350-941 - MSN 077, reg. 9V-SMI (test reg. F-WZNF), with the cabin configuration C42 W24 Y187, powered by two Trent XWB-84, three-shaft turbofans (fan diameter: 118,0 in / 2.997,2 mm; engine architecture: 1F+8IPC-6HPC ^ 1HPT-2IPT-6LPT), each 374,54 kN / 38.192 kgf / 84.200 lbf, flying on the route TLS- SIN (FLT SQ8895), was delivered to the customer on 21. Dec 2016. The aircraft first flew on 02. Dec 2016.
With those two latest deliveries, there are 56 delivered Airbus A350 aircraft to 10 airlines
The list of the delivered Airbus A350 aircraft
Mario
|
|
|
Post by addasih on Dec 31, 2016 16:47:47 GMT 1
Moved here
|
|
ghorn
Outfitting in Hamburg
Posts: 993
|
Post by ghorn on Dec 31, 2016 19:04:59 GMT 1
So we have 47 delivered plus however many AerCap has agreed to take. That looks like two for a total of 49, unless they surprise us by including 60 !!
Happy New Year.
Geoff
|
|
mfranjic
Final Assembly Line stage 1
Posts: 222
|
Post by mfranjic on Dec 31, 2016 22:34:31 GMT 1
|
|
philidor
in service - 6 years
Posts: 8,950
|
Post by philidor on Jan 6, 2017 20:43:23 GMT 1
|
|
sciing
in service - 1 year
Enter your message here...
Posts: 2,502
|
Post by sciing on Jan 7, 2017 22:38:19 GMT 1
Everyone here would agree that this is very unlikely, because it means a frame being delivered without any testflight. But maybe MSN 5 is #50??
|
|
philidor
in service - 6 years
Posts: 8,950
|
Post by philidor on Jan 8, 2017 12:11:56 GMT 1
Everyone here would agree that this is very unlikely It is very surprising, but financial papers are usually well-tipped on deliveries at this time of the year. I don't know where such information comes from, but I suspect deliberate leaks from the manufacturers. That's why this piece of information must at least be taken seriously.
|
|
|
Post by stealthmanbob on Jan 8, 2017 13:22:40 GMT 1
Everyone here would agree that this is very unlikely It is very surprising, but financial papers are usually well-tipped on deliveries at this time of the year. I don't know where such information comes from, but I suspect deliberate leaks from the manufacturers. That's why this piece of information must at least be taken seriously. The only way to reach 50 is to include 2 AerCap and one -1000, if you want them to have at least flown in 2016!
|
|