Post by XWB on Jan 11, 2016 16:51:57 GMT 1
What limit would that be?
|
|
|
Post by stealthmanbob on Jan 11, 2016 16:54:20 GMT 1
Thanks - interesting. Obviously there was no other possibility than to move more onto the ships with the ramp-up. More belugas can not be built - the stupid bureaucracy with the number 5 limit.... I presume that all the tooling for building A300/310s has been scrapped by now as the last one built was nearly 9 years ago ? Although they might have been able to modify an existing frame ?
|
|
|
Post by stealthmanbob on Jan 11, 2016 17:37:04 GMT 1
What limit would that be? Is it something about not having to go thru full certification if 5 frames or less ? PS posts should be in Beluga General Thread ?
|
|
s543
in service - 2 years
Posts: 3,957
|
Post by s543 on Jan 11, 2016 20:53:40 GMT 1
What limit would that be? Is it something about not having to go thru full certification if 5 frames or less ? PS posts should be in Beluga General Thread ? Correct
|
|
|
Post by stealthmanbob on Jan 12, 2016 1:31:39 GMT 1
Is it something about not having to go thru full certification if 5 frames or less ? PS posts should be in Beluga General Thread ? Correct Thanks for that I got something right at last !
|
|
|
Post by addasih on Jan 12, 2016 2:57:01 GMT 1
Moved as requested
|
|
philidor
in service - 6 years
Posts: 8,950
|
Post by philidor on Jan 14, 2016 11:14:38 GMT 1
Is it something about not having to go thru full certification if 5 frames or less ? I think you are right, if fewer than five copies are built, then you don't need type certification, the frames can be individually certified without any reference to a type.
|
|
s543
in service - 2 years
Posts: 3,957
|
Post by s543 on Jan 14, 2016 11:55:09 GMT 1
Is it something about not having to go thru full certification if 5 frames or less ? I think you are right, if fewer than five copies are built, then you don't need type certification, the frames can be individually certified without any reference to a type. And the full certification costs is not far from 1bn......
|
|
|
Post by stealthmanbob on Jan 15, 2016 17:05:25 GMT 1
They work those Belugas hard, late on a Friday afternoon all 5 airborne at once !
|
|
|
Post by stealthmanbob on Jan 16, 2016 16:19:16 GMT 1
Saturday work as well, two in the air now one going to get more wings, those wings fly out of the Broughton factory
|
|