mfranjic
Final Assembly Line stage 1
Posts: 222
|
Post by mfranjic on Sept 11, 2016 21:11:37 GMT 1
The database [ Reply # 54 on Page 6 or click .] of the 787 Dreamliner aircraft was updated with the latest delivered aircraft, and the last of them, 95th in 2016 and 458th overall, is Air New Zealand´s 8th Boeing 787-9 Dreamliner - MSN 37966/ LN 468, reg. ZK-NZJ, produced in Everett, with the cabin configuration C18 W21 Y263 and powered by twin Trent 1000-J2 three-shaft turbofans (fan diameter: 2.845 mm / 112 in; eng. architecture: F-8IPC-6HPC ^ 1HPT-1IPT-6LPT), each 347,54 kN / 35.439 kgf / 78.129 lbf, delivered on 10. Sep 2016, flying on the route PAE- AKL. Air New Zealand´s Boeing 787-9 Dreamliner fleet: Air New Zealand´s Boeing 787-9 Dreamliner, reg. ZK-NZJ, delivery flight ANZ6094. Boeing 787-9 Dreamliner, ZK-NZJ, landing at Auckland Airportmfranjic
|
|
|
Post by stealthmanbob on Sept 14, 2016 11:28:41 GMT 1
Post number 2 updated with a couple more deliveries, 5 so far in Sept all -9s. 7 or 8 more to come this month !
|
|
|
Post by stealthmanbob on Sept 22, 2016 11:06:21 GMT 1
Post #2 updated with a couple more deliveries, making 8 so far this month and 100 year to date ! expect another 4 more before month end.
|
|
|
Post by stealthmanbob on Sept 24, 2016 12:12:24 GMT 1
Post # 2 updated with 3 more deliveries, 11 so far in September with a week to go !
LN 481 for BA should deliver and LN 15 for Air Austal might get out by the end of next week.
|
|
|
Post by stealthmanbob on Oct 2, 2016 15:55:29 GMT 1
Post # 2 updated with September and the YTD delivery stats! The end of financial quarter 3. For October expect 13 deliveries, for a year end total expect around 140, over the Boeing forecast ! For November expect the loading into the South Carolina FAL of the first 787-1000 In December it should be the milestone of the 500th B787 delivery I wonder if AB can beat 5.25 years from first delivery to 500th with the A350 ? I don't think so ?
|
|
|
Post by stealthmanbob on Oct 7, 2016 16:02:46 GMT 1
Post #2 updated, 3 deliveries in the first 3 working days of October !
|
|
|
Post by stealthmanbob on Oct 13, 2016 14:45:58 GMT 1
Post #2 updated with a couple more deliveries, 5 so far this month, another 7 or 8 are likely before month end.
|
|
mfranjic
Final Assembly Line stage 1
Posts: 222
|
Post by mfranjic on Oct 15, 2016 17:19:38 GMT 1
Updated database [ Reply # 54 on Page 6 or click of the 787 Dreamliner aircraft with the: Vietnam Airlines´s 9th 787-9 Dreamliner, MSN 38768 / LN 480, reg. VN-A869, powered by two GEnx-1B74/75P2 twin-shaft turbofans (fan diameter: 2.821,9 mm / 111,1 in; eng. architecture: F+4LPC-10HPC ^ 2HPT-7LPT), each 341,20 kN / 34.793 kgf / 76.705 lbf, that was, flying on the route PAE- HAN (FLT VN96), delivered to the customer on 14. Oct 2016. It first flew on 21. Sep 2016. On the Vietnam Airlines´s # 9 Boeing 787-9 Dreamliner, reg. VN-A869 was the 110th Boeing 787 Dreamliner aircraft delivered in 2016 and 473rd overall. FLT VN96 Mario
|
|
|
Post by stealthmanbob on Oct 28, 2016 11:40:23 GMT 1
Post #2 updated with the latest deliveries, 12 so far in October, only 1 -8 !, and possibly 2 more to to come !
|
|
|
Post by stealthmanbob on Nov 2, 2016 13:15:59 GMT 1
Post #2 updated with the 13 deliveries in October, only 2 -800s one of which was a troubled teen ! YTD deliveries now stand at 117
For November it will probably be 10 or 11 deliveries, including another trouble teen for Crystal Cruises?
|
|