Not sure what to think about this. MSN14 should be next to enter final assembly, and that should happen in September at the latest.
|
|
|
Post by FabienA380 on Aug 13, 2014 10:00:22 GMT 1
This should be the 747th thread What's the A350-FAL status now?...
|
|
XWB
in service - 11 years
Posts: 16,115
|
Post by XWB on Aug 13, 2014 10:09:51 GMT 1
|
|
philidor
in service - 6 years
Posts: 8,950
|
Post by philidor on Aug 13, 2014 16:47:29 GMT 1
Not sure what to think about this. MSN14 should be next to enter final assembly, and that should happen in September at the latest. Probably the usual misunderstanding ... The reporter likely got confused (I don't think he mentions the present FAL rate of two per month, so he must be unaware of it).
|
|
tris06
Final Assembly Line stage 1
Posts: 209
|
Post by tris06 on Aug 16, 2014 7:39:51 GMT 1
Well hopefully in the next week or 2 we really get to see frames moving in to FAL and current ones rolling out. Another 2-3 months and we should be looking at 3 frames a month. I worry though that spirit is still holding it all back. After the announcement of 5 frames being produced (2nd Qtr 2014) that would make the total frames produced at 18 minus 1-2 for the static frames that would mean up to 16/17 msn has been sent from the spirit factory.
|
|
philidor
in service - 6 years
Posts: 8,950
|
Post by philidor on Aug 16, 2014 19:23:55 GMT 1
I think MSNs now rolling out (or about to roll out) entered the FAL at a rate of one per month. We should see frames rolling out as soon as the summer break is over.
|
|
|
Post by Flying Dutchman on Aug 16, 2014 22:01:25 GMT 1
Well hopefully in the next week or 2 we really get to see frames moving in to FAL and current ones rolling out. Another 2-3 months and we should be looking at 3 frames a month. I worry though that spirit is still holding it all back. After the announcement of 5 frames being produced (2nd Qtr 2014) that would make the total frames produced at 18 minus 1-2 for the static frames that would mean up to 16/17 msn has been sent from the spirit factory. Do you mean that in 2-3 months 3 frames will roll out that month or 3 frames will enter the FAL that month?
|
|