Post by marlibu on Oct 16, 2018 23:00:08 GMT 1
so this will start an entire new flight test campaign.
|
|
ghorn
Outfitting in Hamburg
Posts: 993
|
Post by ghorn on Oct 16, 2018 23:20:02 GMT 1
so this will start an entire new flight test campaign. No being readied for delivery to SQ. Geoff
|
|
|
Post by marlibu on Oct 17, 2018 4:07:46 GMT 1
ok, I would find it ridiculous to start another flight test schedule...
|
|
philidor
in service - 6 years
Posts: 8,950
|
Post by philidor on Oct 17, 2018 10:32:19 GMT 1
ok, I would find it ridiculous to start another flight test schedule... There is no reason. This not a new type, not even a new sub-type ! Some new features, like the increased fuel capacity, may however have required an amendment.
|
|
sciing
in service - 1 year
Enter your message here...
Posts: 2,503
|
Post by sciing on Oct 17, 2018 10:40:16 GMT 1
ok, I would find it ridiculous to start another flight test schedule... There is no reason. This not a new type, not even a new sub-type ! Some new features, like the increased fuel capacity, may however have required an amendment. ?? There was an extra 13 test flights campaign with this frame! And after removing the extra test equipment and maybe engine change there will be very likely the standard test flights (1-2 from flight line and than the CAFs) as for any production aircraft.
|
|
philidor
in service - 6 years
Posts: 8,950
|
Post by philidor on Oct 17, 2018 10:58:24 GMT 1
?? There was an extra 13 test flights campaign with this frame! And after removing the extra test equipment and maybe engine change there will be very likely the standard test flights (1-2 from flight line and than the CAFs) as for any production aircraft. 13 additional flights is very far from a full campaign. It is a comparatively small effort to certify some limited changes to an existing type. Some of the tests may also be used to certify new A359 weights variants.
|
|
sciing
in service - 1 year
Enter your message here...
Posts: 2,503
|
Post by sciing on Oct 17, 2018 11:17:58 GMT 1
?? There was an extra 13 test flights campaign with this frame! And after removing the extra test equipment and maybe engine change there will be very likely the standard test flights (1-2 from flight line and than the CAFs) as for any production aircraft. 13 additional flights is very far from a full campaign. It is a comparatively small effort to certify some limited changes to an existing type. I very likely misunderstood your point. But the question was if this frame will see more test flights. Yes, it will at least the usual ones as for any production frames, I guess some rechecks or the standards checks and than the CAFs. Will there be other certification or performance checks for ULR general topics? We do not know. But it is very likely that the test campaign is finished.
|
|
yumi
spotted unpainted on the Flight Line (waiting for painting)
Posts: 1,102
|
Post by yumi on Oct 17, 2018 14:12:52 GMT 1
|
|
|
Post by marlibu on Oct 17, 2018 17:27:00 GMT 1
I guess this really is the answer. So, after all the "certification / amendment test flight" (i use the terms loosely, simply becuase theybwere in various responses), the frame still has to be flight tested to confirm it operates satisfactorily within the design flight envelope. Which is the flight envelope under which its owner will operate it. In layman terms..they want to make sure it operates as it shoukd, after all the extra testing that was done.... Do i make sense..
|
|
ghorn
Outfitting in Hamburg
Posts: 993
|
Post by ghorn on Oct 17, 2018 18:25:46 GMT 1
I guess this really is the answer. So, after all the "certification / amendment test flight" (i use the terms loosely, simply becuase theybwere in various responses), the frame still has to be flight tested to confirm it operates satisfactorily within the design flight envelope. Which is the flight envelope under which its owner will operate it. In layman terms..they want to make sure it operates as it shoukd, after all the extra testing that was done.... Do i make sense.. Time will tell, it may not need any extra test flights compared to a newly assembled frame. Geoff
|
|