Baroque
in service - 2 years
Posts: 3,991
|
Post by Baroque on Nov 25, 2014 16:43:24 GMT 1
Or, the first A350 coke can! Here's the full video. Rather cute.
|
|
tris06
Final Assembly Line stage 1
Posts: 209
|
Post by tris06 on Nov 27, 2014 18:13:50 GMT 1
As someone said on Airliners it seems things are slowing down now as they have no new frames coming into FAL. Its been well over 1 month and they just had 1 frame enter which is now in station 40.
|
|
|
Post by FabienA380 on Nov 28, 2014 2:10:32 GMT 1
Aren't we still at 1 frame/per month?....
|
|
XWB
in service - 11 years
Posts: 16,115
|
Post by XWB on Nov 28, 2014 9:24:31 GMT 1
The production rate is two per month.
|
|
walter
in Body Join
Posts: 134
|
Post by walter on Nov 28, 2014 9:58:31 GMT 1
The production rate is two per month. How dows this match with no new frame loaded into Body Join in November so far? When is MSN017 expected to start assembly in TLS? Or are the Excel-Lists outdated? From January we should see 3/month? Walter
|
|
philidor
in service - 6 years
Posts: 8,950
|
Post by philidor on Nov 28, 2014 10:25:00 GMT 1
I suppose A350 production ramp up is still a bumpy road ... There probably are some occasional hiccups, perhaps before introducing a rate change (the FAL is ramping up to three per month by year-end).
I'm looking forward to seeing two roll-outs per month - that will be a first step.
|
|
|
Post by FabienA380 on Nov 28, 2014 11:00:29 GMT 1
I think probably new frames were introduced into FAL though without any notice from our spotters?
|
|
XWB
in service - 11 years
Posts: 16,115
|
Post by XWB on Nov 28, 2014 11:13:49 GMT 1
We had a similar event in early 2014 when the FAL was upgrading from 1 to 2 frames per month. MSN7 was loaded into FAL in early February while the next A350 was not loaded until the end of April. I suppose Airbus is now working towards 3 frames per month and the FAL needs a bit preparation.
We have seen this with the 787s as well.
|
|
philidor
in service - 6 years
Posts: 8,950
|
Post by philidor on Nov 28, 2014 13:36:40 GMT 1
Exactly my line of thought ...
|
|
tris06
Final Assembly Line stage 1
Posts: 209
|
Post by tris06 on Nov 28, 2014 17:19:01 GMT 1
Well there is only 2-3 weeks of serious work going to go ahead so maybe we will get 1 more frame in before its time for Christmas.
|
|